Baush Logo.png

See below the scope of work carried out at Bausch and Lomb over a five year period

Bausch Waterford.jpg

Overview

Buttimer had a crew on-site at Bausch & Lomb manufacturing base in Waterford continuously for 5 years, from 2005 to 2010. During that period we were responsible for all mechanical and electrical services and production equipment installation for new product line, new piping installations and modifications. A major part of this work was the upgrade and installation of the de-ionised water distribution system in the plant.

b&l 1.jpg

Outline

The above mentioned project involved the design, fabrication and installation of orbital welded, electropolished sanitary 316L stainless steel pipework All work was done in a live clean room production area using GMP and ‘clean-as-you-go’ procedures. Work areas were screened off with sealed ‘bubbles’. The Company acted as Main Contractor and co-ordinated all disciplines from Civil, through Mechanical, Electrical, Sprinkler, Flooring etc. to Commissioning and Handover

b&l 3.jpg

Additional information

Other work carried out over the 5 year period included;

  • Purified water plant replacement

  • Supply and installation of purified water pumps, UV filters, valves, instruments and pipe work

  • Film Line 9 and 10 installations

  • HVAC, compressed air, water, steam, nitrogen and purified water

  • Toric area relocation

  • Relocation of equipment, service stacks and associated mechanical and electrical services

  • Chiller installation and old chiller removal

  • Various steam and condensate installations and modifcations